Asset

Critically

Maintenance action

ARS

4

-Preventive systematic maintenance (PSM) action and RI.

BB

18

-PMS action and RI (eq. Infrared inspection).

SW

24

-PMS action and RI.

FUS

48

-PMS action and RI.

IS

72

-Corrective action: They can be covered with grease or washed regularly.

-PMS action and RI.

CB

100

-Special surveillance, conditional /PM (SCADA monitoring).

DL

147

-Corrective action: If the fault is minor.

-PSM action (SCADA monitoring).

PTR

175

-Special surveillance, conditional /PM (SCADA monitoring).

-PMS action and RI.